Ask Your Questions on RERA Karnataka

Name:

Location:

Email ID:

Ask Your Question Here :

QUESTIONS

Mohan,Bangalore
Kapil Mohan Sir, I have purchased a land. Do i need to register with RERA ?
Shabber qureshi ,Manvi kallur
Sir , I bought plot (30-40) in my village (2011).it is not dc conversion. I was written court affidivate from owner.sir can it come under RERA act?please tell me.
Kapil,Bangalore
Nice session
Dr S D Manay,Bangalore
If answers to the questions asked also published there would have been very few questions
Tribhuvan Avasthi ,Germany
Could you please tell me the list of RERA compliant (registered) projects in Bangalore? Thanks
Ashish Kakani,Bangalore
hi, My builder ND Developers has not yet registered the project with RERA. what can be done here?
John
Sir , I bought plot (30-40) in my village (2011).it is not dc conversion. I was written court affidivate from owner.sir can it come under RERA act?please tell me.
Nagabhushan,Bangalore
I am told by my builder that they are in the process of registering with rera whereas on the search option of RERA no results for my builder or sobha are displayed.How can we know the current status for a builder.
Sevvel,Bengaluru
can we start our agreement execution with our customers based on RERA Acknowledgement number
Shruthi,Mysore
Good evening.. The live webcasting was interrupted due to technical error. Hence please arrange the livewebcasting of Honourable Secretatry of RERA once again so that it will help the builders/developers.
vijay kumar,bangalore
Hi sir Happy evening , my self vijay i am having a propritaryship firm where i am only person involved can i register that firm name as an agent by paying 25000 since for me 2 lacks is huge pls let me know Thanks in advance waiting for your reply
Anil,bangalore
Live streaming interrupted halfway through. Will you please make the recorded version available to public through youtube or any other form please?
J Rohit,Bangalore
This webinar is not working!
Satya prakash,Bangalore
Live webxast has been interrupted
Rakesh,Bangalore
Dear sir, I am a Builder by profession and I have already registered into RERA, I need further clarification on the sale agreement and sale deed formats, is there any Draft that i need to Follow or any clauses to be incorporated in the sale agreement/ Sale deed draft
Vijayc,Bangalore
Inspite of paying the full amount to Bda for Kempegowda Layout we have not got any assurance from Bda regarding project completion and providing full amenities is govt provide protection to govt bodies such as BDA and KHB
Jyothi,Bangalore
Why government bodies such as BDA and Karnataka housing board have not announced their inclusion in RERA
subroto chakraborty,bangalore
Can a part of a project be under Rera. Projects without Bwssb snd Bescom supply be excluded from rera act?
rangavm,honnavar
as for as plotted development, 60% completed project means, 60% released plots by authority or 60% works completed. who is authority , whether local panchyath or planning authority
Sanjay,Bengaluru
How should the common areas be conveyed to the Association of Allottes
pallavi,bangalore
from a developers point of view, i wanted to understand how to charge for the exclusive balcony and exclusive terrace space if the apartments are sold on carpet area basis
Ravi,Bangalore
After RERA registration would be done on Super built up area or carpet area .
Vijay,Bangalore
Why BDA and KHB are not part of RERA
Arun,bangalore
Dear Sir, I had a sale agreement for purchasing a flat on the basis builder will register the project in RERA if required. when the RERA is being effective when i asked my builder he says project is excluded because 80% work is completed,when i asked for the completion certificate he says he does not have it yet. then i asked him to go for a extra addendum on previous sale agreement which he denied. On denying further payment from me he claims interest on me for rest of the amount, is it legal.
Rakesh,hyderabad
Sir, you mentioned that u are sending notices to 100+ builders who have not registered. Can you make that list public
Shruthi,Bangalore
1. With regard to the clarification that was given with regard to “Ongoing Project” under the Press note dated 18/07/2017, Point No. (iii) which states that “ where all development works have been completed as per the Act and certified by competent agency and sales/lease deeds of 60 % of the apartments/houses/plots have been registered and executed” ; the Government has clarified the interpretation of competent agency to be the authority under the Section 190 of Karnataka Municipalities Act.
Mansoor A Khan,Bangalore
Sir, Incase we have got the RERA acknowledgment no when is the RERA registration no expected as banks disbursements are subject to registration nos.
Arun,bangalore
if the purchaser had done sale agreement before RERA effective date in Karnataka. can the purchaser has rights to ask builder for RERA registration incase he has not got the completion certificate where as 60% of sale dead execution is a unknown fact for the purchaser. in case the builder is not ready for RERA registration is it legal to ask for the extra addendum to the previous agreement similar lines with the RERA rules.
shreepad,bangalore
Can we start advertising/marketing/ selling of plot after apply for registration and getting the acknowledgment number or we need to wait for the registration certificate for starting the advertisement, marketing and sales activity
Dhanraj K,Bangalore
If an organisation like BDA is not registering their ongoing projects with RERA, what action is being taken on BDA ?
Amruta,Bangalore
Before grant of registration are promoters allowed to Participate in International and Domestic EXPO’s.
John,Bangalore
On page says webinar at 10am and another 5pm…..????
Amruta,Bangalore
Rights of Club House and other such facilities while two or more communities are sharing, then how to consider while registering a project.
Arvind,hyderabad
HOW CAN WE WATCH THE WEBINAR ? WHAT SITE ?
Sharath Coorg,Bengaluru
1. When will details of registered projects be displayed on the website? 2. Should new agreements for sale conform to a standard format? When will RERA make the standard format available?
UDAY,BANGALORE
When will the RERA Login id and password will be provided, Why agents have to register area specific instead of whole Bangalore or Karnataka
Srinivas,Bangalore
How can we join the webinar?
Amruta,Bangalore
In case of project wherein application for registration under RERA has been made, whether the Promoter can make the future collections, (under the payment terms with the allottees) , from allottees for all those sales concluded prior to notification of the Act .
Renaissance,bangalore
Renaissance,bangalore
Ajith,Bangalore
Can we start advertising/marketing/ selling of plot after apply for registration and getting the acknowledgment number or we need to wait for the registration certificate for starting the advertisement, marketing and sales activity
Gopal,Bangalore
Can developers continue to execute Pre-RERA agreements, as Karnataka has not notified the standard agreement yet.
Shankar Srinivasan,Bangalore
What Is the cut-off date for all projects applicablility by KRERA ( applied for OC/CC , Received Partial OC/CC and received OC/CC , etc., ) is it 1st May 2017 ( As per RERA Act ) or the date of KRERA Rules notified and gazetted ( 10th July 2017 ) ?
Anil,Mysuru
AFETR IMPLEMENTATION OF RERA, all are thinking that Real estate is also going to be more organized than before? Is it yes, if yes how you can define or justify?
Harshvardhan Bhadani,Bangalore
Sir, May I know when the authority will upload the details of RERA registered projects in Bangalore on its website?
Amruta,Bangalore
Can a project which has already applied for RERA registration undertake branding activities.
nithish,mysore
CA certificate should be on the basis of cash or accrual?
shreepad,bangalore
Could you please define “Ongoing projects”? Can a builder sell the property with RERA acknowledgement no? A project launched in 2012, suppose to complete in 2016, but builder saying that, they approached RERA and requested time till 2020, is it valid?
ramya,Bangalore
should the builder insist money from customers to RERA account or any other account
SANU,Bangalore
If a broker is not registered with RERA & still can he /She sell the properties?
ANIL,Mysuru
What are the consequences for an employee if builder found that he or she not following or implementing RERA rules
Arjun,Bangalore
1) Please confirm if majority of allottees would mean majority only in respect of the sold units. 2) Can a prior consent in respect of any structural changes or future alterations to the project be sought from the allottees at the time of entering into an agreement to sell?
Anil,Bangalore
Anil,Bangalore
babu,bangalore
Is RERA applicable uniformly all over Karnataka. No jurisdiction specified in the notification. Pls clarify?
sahil,Bengaluru
Could you please define “Ongoing projects”? Can a builder sell the property with RERA acknowledgement no? A project launched in 2012, suppose to complete in 2016, but builder saying that, they approached RERA and requested time till 2020, is it valid?
Nithesh ,Mysore
Sir, Ours is an housing society and have entered into an MOU with developers for ready sites. We do not develop the sites/plots but facilitate the purchasing of the ready sites to the members of the society, developed by the developers with whom we have entered into an MOU. How are we supposed to register under RERA? As an Agent or as a Developer?
babu ganesh ,bangalore
As a banker – will RERA committeevisit the projects to check check progress deviations and violations?
L H RAO,Bangalore
Is there a Turn Around Time you promise for the inquiries raised on RERA through info.rera@karnataka.gov.in Two inquiries sent no response. list of registered people how often you update and where can we find updated list. Earlier it was on the web, now its not available
Anil BH,Bangalore
Ramky one north, Avalahalli, North bangalore is being developed by Ramky farms and estates. It is still not registered under RERA Karnataka even after deadline imposed by Karnataka government. They have just completed 30-35% of project till now. They have delayed project beyond the timelines committed by them & due to unilateral agreement between Ramky & Consumer they are not paying any penalty charges for project delay but charging penalty from customer @18pa for delayed payments. Kindly help
sajjad ali,Bangalore
Dear Sir . IF a project has cc& oc comply but not registered to RERA then is possible to sell that as im employee in builder.
Vinoda,Mysore
Sir, We are developers and have entered into Agreements/MOU with House Building Co-operative Society. We have collected money in installements from them for land procurements and we have purchased only part of the land required for the project. How to proceed with those projects?Can we collect money further in installments?
SRINIVASAN,BANGALORE
Need clarity on carpet area calculation.1) Balcony and utility area is with or without walls 2)Is extent till wall outer edge for the carpet area calculations if it is adjoining a balcony or veranda.
Shruthi Acharya,Mysore
Sir, 1. Ours is an housing society where in we deal purely with ready plots selling to its members. Should we register ourselves as an agent?
Ramya,Bangalore
1. If builders have already sold part of the project and registered with land as Undivided share also being transferred. With RERA how will these land shares get conveyed to society again 2. In villa projects if approval was available for layout and if builder takes individual plans for construction then will this be treated as layout project by RERA or villa project
Shruthi Acharya,Mysore
Sir, 1.Who are competent agency mentioned in the act and rules? 2. In projects where civic amenities are handed over to the government through registered Deed of Relinquishment, are we supposed to register those projects under RERA?
Shalini,BANGALORE
Need clarity on carpet area calculation as mentioned below . 1) Balcony and utiliy area is with or without walls 2) Internal and external wall defination near the shaft . Is the wall part of the carpet area if it is adjoining a shaft. 3) Car park numbering to be as per flat numbers or general numbering i.e 1 to n
Ramya,Bangalore
How do we understand which projects have received registration number.
Ramya,Bangalore
5. Who is competent official for issuing completion certificate. 6.How do we understand that the project is exempted from RERA 7. After 30days of submission will number be automatically allotted. How do we confirm that 8. Is there any check done in sub register office to prevent developers from registering projects without RERA number
Ramya,BANGALORE
Ramya,BANGALORE
SRINIVASAN,BANGALORE
For all future purposes does the developer need to quote the apartment cost in terms of cost per sqft on carpet area or does only mentioning the carpet area suffice along with cost shown as cost per sqft bua
Ramya,BANGALORE
1. Who is the competent authority for giving OC. Is it eh authority who has issued sanction plan or Gram panchayat if property lies in panchayat limits 2. In layout projects in Chickballapur where 40% sites are released and common area relinquished to local body is RERA applicable 3. If project is completed and OC was not applied on date of notification and some flats are occupied and few unsold without formation of registered society is RERA applicable
Lalit,Bangalore
There are Plotted Developments which are beyond the Jurisdiction of the Municipal Corporation. In such cases who will be the COMPETENT AGENCY?. Will it be Panchayat? 2/2
Shweta,Bangalore
What is the process for Agreement of Sale going forward? Should the Agreements be registered or adjudicated for requisite value.
Lalit,Bangalore
Who will be considered “competent agency” as mentioned in (iii) and (iv) of point number 4 in the rules. Vide a press release RERA Karnataka has tried to give some clarity on the issue with the following. “The competent agency to certify the completion of works is given at the end of the note ***” Further at the end of the note they have given an explanation in the form of “***: Section 190 of the Karnataka Municipalities Act 1964……………” 1/2
Salman Dawood,Bangalore
Kindly give us sample calculations for the following type of projects with regard to the amount to be maintained in the project account from collections: 1) New project 2) Under Construction Project (collections more than construction expenses) 3) Under Construction Project (collections less than construction expenses) 4) Completed project where OC is not received or applied for Kindly give us the mathematical calculation to increase our understanding on the same
srinivasan,bangalore
SRINIVASAN,BANGALORE WHEN WILL PROJECTS APPLIED FOR REGISTRATION AFTER 31/7/17 GET REGISTRATION NUMBERS.WILL IT BE ISSUED BEFORE ONE MONTH FROM THE DATE OF SUBMISSION.CAN ADVERTISING & SALES PERMITTED BASED ON SUBMITTED APPLICATION ACKNOWLEDGEMENT NUMBERS.
Shankaranand,Bangalore
sir, i have applied for RERA Agent Registration, i have been given an acknowledgment Number (AG/KN/170816/000669). CAN I START THE BUSINESS GIVING ACKNOWLEDGMENT NUMBER AS REFERENCE/TEMPORARY RERA NO.?
SRINIVASAN,BANGALORE
WHEN WILL PROJECTS APPLIED FOR REGISTRATION AFTER 31/7/17 GET REGISTRATION NUMBERS.WILL IT BE ISSUED BEFORE ONE MONTH FROM THE DATE OF SUBMISSION.CAN ADVERTISING & SALES PERMITTED BASED ON SUBMITTED APPLICATION ACKNOWLEDGEMENT NUMBERS.
Salman Dawood,Bangalore
In a single project which has different phases and different handover dates, is it required to register only once or can the developer register separately for the different phases?
Salman Dawood,Bangalore
How does one arrive for cost of land for a Joint development project. Does this include the cost of making good the land, approvals and amounts given to owners or is it to be calculated as per the guidance value of land?
Salman Dawood,Bangalore
For all future purposes does the developer need to quote the apartment cost in terms of cost per sqft on carpet area or does only mentioning the carpet area suffice along with cost shown as cost per sqft suba?
Salman Dawood,Bangalore
Does the developer need to insure the title of the property for only the duration of the project or does it extend beyond ?
Salman Dawood,Bangalore
If one does not intend to sell any part of the project do we need to register under RERA?
Ashwin ,Bangalore
Dear Sir, 1. When will prospective buyers be able to access online records relating to projects which have been registered under RERA?
Niraj Kumar,Bangalore South
Hi, I am keen to understand about the 5 years warranty clause made mandatory by RERA. I would be glad to know more about this and the items it covers under this warranty. Hope it covers the entire finishing and material used in the making of my dream home. Regards,
siddharth,hennur
Where do we find RERA Registration number for Projects in Karnataka. How will you calculate the fine to be paid by the builder in case of delay in project completion?
Shyamlal Sharma,Mysore
Sir, if 100% Correct Dimension Report is released, more than 60% sites are registered, 80% of the development works are completed, is it necessary to register that project under RERA?
shubham,bangalore
Could you please emphasize on the fact of when it is likely to be releasing the RERA numbers though good number of builders and agents have submitted the applications for quite some time back and no response from the department regarding the final number.
Nitin,Bangalore
Dear Sir, The following are the queries 1) At present we are franking the Sale agreements, it is now compulsory to get it registered. 2) Is 5 years warranty clause applicable in Karnataka 3) When will the Draft Sale agreement copy be released
SRINIVASAN,BANGALORE
SRINIVASAN,BANGALORE SRINIVASAN,BANGALORE WHEN WILL PROJECTS APPLIED FOR REGISTRATION AFTER 31/7/17 GET REGISTRATION NUMBERS.WILL IT BE ISSUED BEFORE ONE MONTH FROM THE DATE OF SUBMISSION.CAN ADVERTISING & SALES PERMITTED BASED ON SUBMITTED APPLICATION ACKNOWLEDGEMENT NUMBERS.
Ajay Bhavikatti,Bangalore
Sir, Do we need to deposit the 100% of collections from Customers in RERA Account or only we have to deposit 70% from the collections as required under RERA Act. Pls advise on the same.
Sonam,Thane
In Maharashtra Rera website public is able to see all the registered projects under RERA but here we cant see. If i want to see weither the project in which i have booked my flat is registered or not i am not able to look.
Ajay Bhavikatti,Bangalore
Sir, While registering our project on last day due to some technical problem, we could not up load the correct information in registration format. Now what is the way forward and how to rectify the same. Pls advise on the same.
Ajay Bhavikatti,Bangalore
Sir, We have registered our project as one project consisting of Phase-1,2 and 3, now we would like to split the projects in to two or more Phases. Now is it possible to split the project in two or more Phases.
Anil,Bangalore
How does RERA(Authority) deal with cases filed against promoter where promoter is looking for insolvency/bankruptcy? How such cases will be resolved and homebuyers will get their money with all expenses and interest included, back? How much time such cases take vis-a-vis 45days in case of default? Thanks,
Rakesh,Bangalore
Corrected question- SIr, In order to apply for an OC there MUST be pre-requisites otherwise ANY builder can apply for OC. WHat are those ? If a builder is in a state – 1. Without Fire NoC 2. Without construction complete, Can a builder apply for OC and get an exemption from RERA ? The BBMP bylaws of 2003 mention Fire NOC is a pre-requisite but is that the practice ?
Umesh Venkatesh,Bangalore
1. There is a SCAM (DREAMZ) which has happened and CID is investigating, No charge sheet filed yet. Can we still register a complaint at RERA. 2. CID is planning to submit report soon and says they may attach all properties and transfer the case to some Dept. which will then takeover. What will RERA do in such case ? Where should complainants go.. should we still approach RERA or ask CID ?
Rakesh,Bangalore
SIr, In order to apply for an OC there MUST be pre-requisites otherwise ANY builder can apply for RERA. WHat are those ? If a builder is in a state – 1. Without Fire NoC 2. Without construction complete, Can a builder apply for OC and get an exemption from RERA ? The BBMP bylaws of 2003 mention Fire NOC is a pre-requisite but is that the practice ?
Numeir,Bengaluru
Having booked a Flat with a prominent builder in Bengaluru prior to RERA would be getting the handover by next year March, but as per the RERA guidlines the Flat valuation should be arrived by carpet area and not by buit up area, how is this relative change benefit the end user in this scenario as the calculation from builder side is done on Super Built Up Area. Will this downside affect the resale in the future and its value? Thanks for addressing my concern
SRINIVASAN,BANGALORE
SRINIVASAN,BANGALORE WHEN WILL PROJECTS APPLIED FOR REGISTRATION AFTER 31/7/17 GET REGISTRATION NUMBERS.WILL IT BE ISSUED BEFORE ONE MONTH FROM THE DATE OF SUBMISSION.CAN ADVERTISING & SALES PERMITTED BASED ON SUBMITTED APPLICATION ACKNOWLEDGEMENT NUMBERS.
Shankar Srinivasan,Bangalore
What Is the cut-off date for all projects applicablility by KRERA ( applied for OC/CC , Received Partial OC/CC and received OC/CC , etc., ) is it 1st May 2017 ( As per RERA Act ) or the date of KRERA Rules notified and gazetted ( 10th July 2017 ) ?
Aditi,Bengaluru
1) What is the last date of submitting applications for registration in Karnataka (with and without penalty)? 2) When will the details of registered projects and agents be available on the RERA portal? 3) Is there a prescribed form of certification by the Engineer, Architect and CA? 4) Could you please illustrate the withdrawal mechanism from the 70% separate bank account in case of ongoing projects. 5) What happens in case the SC/HC rules against dilution of the Rules by various states?
Mahadevan,Bangalore
What actions will the authority taken on builders who are advertising in any form (paper, boards on roads, digital) and not registered under RERA as ongoing projects?
Mahadevan,Bangalore
If builder has not completed the amenities like Swimming pool, Children park and any development works is in progress also should come under RERA, how will the authority ensure this?
Shankar Srinivasan,Bangalore
Can KRERA will ensure that BDA and BBMP publish the details of the projects for which OC/ CC has been applied / awarded / rejected till date ? Can KRERA will ensure the Registrar of Co-operative Society to Publish those projects which have been formed Association till date, as per Karnataka Apartment Ownership Act 1972 ?
SRINIVASAN,BANGALORE
WHEN WILL PROJECTS APPLIED FOR REGISTRATION AFTER 31/7/17 GET REGISTRATION NUMBERS.WILL IT BE ISSUED BEFORE ONE MONTH FROM THE DATE OF SUBMISSION.CAN ADVERTISING & SALES PERMITTED BASED ON SUBMITTED APPLICATION ACKNOWLEDGEMENT NUMBERS.
Mahadevan,Bangalore
There are 10000 + projects registered in Maharashtra and only 700 + in Karnataka, what actions will be taken by authority to increase these numbers?
Shankar Srinivasan,Bangalore
While as per RERA section 4 (3)(d) The Promoters ” be responsible for providing and maintaining the essential services, on reasonable charges, till the taking over of the maintenance of the project by the association of the allottees;” – How this section will benefit the Homebuyers when KRERA Rules are diluted for ongoing projects those with partial OC/CC, or applied for OC/ CC are excluded ?
Nilesh N Shah,BANGALORE
Sir, Builders are asking buyers registering property without getting OC and approvals. They do not come under RERA. I request you to include all such projects which builders are forcing on customers and trying to beat the system and avoid coming under RERA. All projects for which OC is not obtained or applied must come under RERA. This will be of great help to buyers and we can hold developers accountable. Pls guide and instruct such errant builders to come under RERA. Thank you.
Shankar Srinivasan,Bangalore
While as per section 4 (3)(b) the promoters ” be responsible to obtain the completion certificate or the occupancy certificate, or both, as applicable, from the relevant competent authority as per local laws or other laws for the time being in force and to make it available to the allottees individually or to the association of allottees, as the case may be;- How KRERA excluding projects which have applied for OC/CC is justified ?
Nilesh Shah,BANGALORE
We have booked a property in 2010, Its 7 years and builder has not yet delivered the flat. The project “Mantri Pinnacle” is not registered under RERA, Can you Sir, Kapil Mohan ji, direct the developer to register the project under RERA. As buyers we are facing grave financial and emotional distress. If builder does not register under RERA, how can we take the help of RERA. Pls Advise. ?? Thank you.
Shankar Srinivasan,Bangalore
While section 3 (1) of the Act “that projects that are ongoing on the date of commencement of this Act and for which the completion certificate has not been issued, the promoter shall make an application to the Authority for registration of the said project within a period of three months from the date of commencement of this Act” – Knowingly why KRERA Rules have excluded ongoing projects with conditions ?
sajjad ali,thannisandra main road
HI.. Dear sir . how can i sell the apartment which is not highlight in rera since project is cc& oc complain.
Gaurav,Delhi
Under which Act/Law Occupancy Certificate for group housing is defined ? Under which Act/Law Completion Certificate for group housing is defined ? How far are they different in Karnataka, as stated in RERA Act 2016 ?
Easwaran ,Bengaluru
Q.1 :Whether a Land owner, who is not participating in project development and who is only receiving a fixed percentage of revenue share (31%) through Escrow bank account mechanism from the Developer, is required to be registered as a Promoter together with the Developer for registration of the Project under RERA ? Q.2 : Whether the Developer can release revenue share through Escrow Bank account mechanism on daily basis, in terms of JDA & whether Land owner is required to maintain 70% account
Venkatesh,Bangalore
Sir, what is the timeline for RERA Registration? Why not disclosed who are already registered? is it mandatory that who are working under real estate firm to be register?if yes who should pay Developer / employee?
SRINIVASAN,BANGALORE
WHEN WILL PROJECTS APPLIED FOR REGISTRATION AFTER 31/7/17 GET REGISTRATION NUMBERS.WILL IT BE ISSUED BEFORE ONE MONTH FROM THE DATE OF SUBMISSION.CAN ADVERTISING & SALES PERMITTED BASED ON SUBMITTED APPLICATION ACKNOWLEDGEMENT NUMBERS.
Rangaswamy,Bangalore
Dear Sir, I had one question why RERA Registration charges are variable with other state? in Maharastra agent registration charging only 5k but here 25 k?
Rohit,Bangalore
Dear Sir Thanks to giving opportunity us to ask question about RERA My first question is 1) As we have applied for RERA Registration long back how long we have to wait for RERA No 2) As RERA Said 10% is the value of agreement Between Owners & Builders, but some builders asking 20% how? 3) Regarding Promotional activity(Online Marketing) is there any Guideline By RERA or we have to fallow Builders Guide-liens.
Jyothi,BANGALORE
Sir, What is the status of ongoing projects that are not registered under RERA? Can we approach/complain on ongoing projects that have not been registered under RERA before your authority?
Arun Kumar H,Bangalore
Dear Sir, In a Project, we have already applied for the CC, but yet to receive the certificate. Can we do the online RERA Registration by uploading the acknowledgment copy. Thanks and Regards Arun
SRINIVASAN,BANGALORE
WHEN WILL PROJECTS APPLIED FOR REGISTRATION AFTER 31/7/17 GET REGISTRATION NUMBERS.WILL IT BE ISSUED BEFORE ONE MONTH FROM THE DATE OF SUBMISSION.CAN ADVERTISING & SALES PERMITTED BASED ON SUBMITTED APPLICATION ACKNOWLEDGEMENT NUMBERS.
Sudhakar,Bangalore
Sir,Did RERA Registration mandatory for taking commission against property? How about 60% completed projects plots/Apartments? Did RERA Registration number to be shown all promotion activities?
D Murali,Bangalore
Applied for RERA as Individual registration . My concern name is Amrutha Assetz a sole proprietor , when we can expect the Registration number , thanks.
Rohit,Bangalore
Hi, We would like to know whether we can start marketing and selling our projects with the Application Acknowledgment number.
Ashwin,Bangalore
Dear Sir, I would like to know whether in Karnataka should we register our Sale agreements? If yes what would be the stamp duty charges and would that be adjusted towards my final registration?
Sanjay,Bangalore
Can Developers start selling based on RERA Acknowledgement numbers, can they advertise, can they call you and propose sale of a flat. When are you going to allot registration numbers to Developers & Agents- why was there so much of a delay in Karnataka for launching the RERA Website – request your kind replies.
Rachana,Bangalore
Under construction property with 720 flats, did not applied for RERA yet, and selling flats in full swing. 1. If they donot register for RERA in future also, will RERA will take any action against them? 2. How RERA will make sure that, they register their property with RERA?
Sunil,Bengaluru
Dear Sir, Please clarify on submission of hard copy of all the documents at RERA office. when we need to submit & last date for submission etc.,,
Amit Raj,Bangalore
Sale deed executed before 1st May 2017, but amenities maintenance not been handed over to association, neither OC/CC being provided by the builder yet, does this property falls under RERA?
Mansoor A Khan,Bangalore
Sir, 5. What happens when even after repeated reminders to clients for payment, client fail to pay us on time. 6. What happens if banks delays the disbursements even after consents given from clients. 7. Any kind of offer we promote do we need to take prior approval from RERA
Sandeep Jhunjhunwala,Bangalore
In cases of agreements executed prior to May 1, 2017, whether new agreements in line with the RERA Act/ Rules required to be executed by way of a supplementary agreement and whether the contractual obligations such as interest/ compensation, structural defect liability etc would prevail as per the old agreement or as per the provisions of the Act/ Rules?
Mansoor A Khan,Bangalore
Sir, I had few question to which need your guidance 1. Is RERA going to share the new agreement format which we need to follow or the old agreements needs to be followed. 2. Since we have got RERA acknowledgment no. is it mandatory for us to take approval from RERA before advertisement / promotion of project. 3. Since we have ongoing projects what happens if clients delay payments. 4. ESCROW account and how it should be operated.
Mansoor A Khan,Bangalore
Sir, Since we had already signed agreement of sale in 2015, 2016, what happens to all the old agreements. Do we have to follow the old agreements itself or the new agreements by RERA if ready needs to be followed.
Arun Kumar,Bengaluru
Sir, In the registration portal we are not able to upload all the documents since the file size exceed the limit prescribed like for Ex. Plan Sanction and Project Plan approved Will be consisting of more than 10MB that exceeds the limit of 5MB prescribed in the portal. so what is the alternative for this case
Arun Kumar,Bangalore
Sir, For Newly Launched Projects Plan Sanctions will be approved first and we will start the project But Commencement Certificate we will get later, in this case Karnataka RERA Asks Mandatorily Commencement Certificate for RERA registration so which date we need to mention in the registration for start of the project either Commencement Certificate or Plan sanction date because Act says we need to register the project within 30 days from the start of the project.
Shyamlal Sharma,Mysore
Sir, after uploading all the documents on the website, the portal asks for accepting two conditions. Out of which one is Except Aadhar card number all other documents are accessible for public domain. Does the domain allow financial statements to public access? Because financial statements are private documents of the promoter and even ITR filed is not accessible for public. Hence please clarify regarding the documents which are accessible for public.
SRINIVASAN,BANGALORE
Sir, Suppose we apply for registration after 31th of July 2017 i.e. 5th of August for all our projects then from 6th are we eligible for advertising & marketing with the acknowledgement numbers of projects. Please confirm as we have applied for registration for all our projects by 5/8/17.Hence want to start marketing activities. Srinivasan.S Shriramproperties 8105525525.
Sandeep P,Bengaluru
Sir, the SEARCH bar on the RERA Karnataka website does not yield any results. How do we find out whether our ongoing project has been registered by our developer or not? Kindly look in to this issue and ensure that the search bar is made functional immediately.
Sandeep P,Bengaluru
Sir, The list of projects on website for which registration applications have been received TILL DATE shows records of up to 31 July 2017 only. While the projects are being allowed to be uploaded even after 31 July, the list on the website is NOT updated. We will never know if our project has applied for registration or not. The contact phone no. of RERA authority does not provide any clarification or information. Emails sent on info.rera are not even acknowledged or replied. Pls do the needful.
Sandeep P,Bengaluru
Sir, The RERA-Karnataka website for filing complaints by public is not user friendly. It asks for respondent info which may not be readily available. There is no field for project name. Developer mobile no. is mandatory which is generally not known to customers. There is no provision for a feedback or suggestion by the public. It is not clear whether we can file complaint against an ongoing project which is not registered with RERA by the developer. Emails sent to info.rera are not replied.
Suresh NR,Bengaluru
What is your take on series of issues raised by one of the senior activist in his article Published in online portal of one of the leading news agency in Karnataka – http://m.vijaykarnataka.com/lavalavk/property/rera-act-and-problem-in-buying-house/amp_articleshow/60057486.cms
Suresh NR,Bengaluru
What is your take on issues raised by senior city activist in his article Published in online portal on one of the leading news agency – http://m.vijaykarnataka.com/lavalavk/property/rera-act-and-problem-in-buying-house/amp_articleshow/60057486.cms
Suresh NR,Bengaluru
What is your take on issues raised by senior city activist in his article Published in online portal on one of the leading news agency – http://m.vijaykarnataka.com/lavalavk/property/rera-act-and-problem-in-buying-house/amp_articleshow/60057486.cms
Sundar Rajan,Bangalore
Why should we register as an agent for every region separately? Ideally we should have one registration to operate in the entire state. Kindly do the needful
Ajit Naik,Bengaluru
Your appointment as a single member Regulatory Authority is against the provisions of section 20 (1) of RERD Act. This has been very clearly clarified by the Ministry of HUPA, GOI in the FAQ booklet published on January 17, 2017. Please refer FAQ No. 1, 2, 3 & 4. Such appointment of Interim single member Regulatory Authority is being opinionedas as against the intention of the law makers by many legal luminories and is likely to be squashed by higher courts. What are your views on it?
Sandeep P ,Bengaluru
Can I file online complaint if my developer has not registered the project with RERA. but it is still incomplete and development work going on. Builder says the project is exempted. He says he has applied for OC and therefore he is excluded. The possession is still not offered and lot of work pending. 95% payment already taken four years back promising possession in 2014 but still not done. Can we claim and get delay compensation as per RERA rules?
VADIRAJU HM ,Bengaluru
A Builder with intention of cheating people has registered a Residential plot illegally using all Bogus approvals,GPA and Forged documents from 2013 to 2016.Can a aggrieved homebuyer register a complaint against the Builder under RERA Karnataka and get a Justice or relief from the above Fraud?
Rakesh K,Bamgalore
Sir, if a builder has not completed construction, fire NOc not there- can he get away with Applying for OC and not register for RERA. Is that possible ?
Satya Prakash,Bangalore
How and where can we complain against non registration of an ongoing project by a developer? What if the developer has applied for OC in backdate in connivance with the BBMP officials? RERA website asks for name and mobile no. of developer. Most developers execute projects in the name of SPVs details of which are not known ro customer. Companies will not have a mobile no. Emails sent to info.rera are not answered. No feedback provision in website.
Santosh Patil K,Yeshwanthpur
Santosh Patil K,Yeshwanthpur
Tushar,Hubli
How Many Real Estate Companies Have Registered So Far In RERA Portal ?
Ganesh Prasad,madivala marsur
Please clarify if apartment complex builder is liable to provide the amenities as shown in the printed advertise pamphlet and the video recordings.
S K Swamy,Bengaluru
1. National Green Tribunal originally ordered projects to be 30 meters away from water bodies. Later they changed it to 75 meters. Projects which are in advanced stages have been stopped. I, believe the cases are Supreme Court. The delay in decision affects both Builder and Buyer. What happens to projects started prior to the 75 meters rule. 2. Why a Channel Partner has to get registered? CP brings in a client but Builder gets into a Sale Agreement and is responsible. CP cannot be liable .
B M Gopala,Gauribidanur
Respected sir Is RERA applicable for Rural areas of Karnataka. I have purchased a site 5 kms from Gauribidanur Town. Developer is delaying the site Registration from the last 3 years.
anand,bangalore
i need your bank account details.
Ashwin,Bangalore
Dear Sir, RERA Act covers ongoing projects, my question pertains to projects where the delivery deadline has already been missed by the builder. In such circumstances will customers receive compensation for late delivery from the date originally given or from a new date which the builder provides the regulator.
Anirban Kaushik,Bengaluru
RERA rules states that any ongoing/incomplete projects which are yet to get completion certificate must be registered with RERA else builder cannot sell the property. Recently I have started looking for house and none of the builders have registered with RERA and are reluctant to do so in future. they are thinking they would give fine whenever the authority ask for it. How can I as a buyer go ahead to buy house from builders in that case? How strictly RERA act will be implemented in Bengaluru?
Dayananda LLB and LLM,BANGALORE
Dear Sir, Some of the Documents not uploaded properly even there is no option of multiple attachment for land Documents and NOC;s etc..because of that some of the Documents not been uploaded properly, kindly update the web by giving an option of rectification of Data and uploading of Documents otherwise kindly arrange to take soft copy of Documents along with hardcopy phisically.
Dayananda LLB and LLM,BANGALORE
Dear Sir, We have done the online registration under RERA and some of the Documents been uploaded wrongly with in that size limit we canot upload proper documents and further we dont have any option to rectify the inadvertant errors crept while registration, in order to rectify the things and in order to proper uploading of documents you have to give chance to upload proper Documents and rectify the same the promoter is not having any option to rectify the inadvertant error..
Kumar,Bangalore
How many real estate companies have registered so far in RERA portal ?
Sunny,Bangalore
As per the notification in official CREDAI website, it is mentioned that the builders can quote the cost of the apartments only as per the “Carpet Area”. However, builders are still quoting the cost as per Super Built-up Area. Is this expected to change ?